Customer: Invenergy Wind North America, LLC
Location: Ellensburg, WA
EPC Contractor: Gemma Renewable Power, LLC
Design Engineer: Barr Engineering / ECI

Gemma Renewable Power began construction on the Vantage Wind Energy Project in September 2009. The Vantage Wind Farm entailed the installation of 60 General Electric 1.5 MW SLE wind turbine generators, 18 miles of roads, 115,000 feet of collection system trenching, 3.2 miles of transmission line and the construction of a new substation. Gemma performed all of the foundation installation, wind turbine generator erection, tower wiring, electrical collection system installation and substation construction necessary for the completion of the project. Gemma completed the Vantage Project ahead of schedule in September 2010.