Owner: Larkspur Energy, LP (an InterGen North America Company)
Location: Otay Mesa, CA
EPC Contractor: Gemma Power Systems California, Inc.
Design Engineer: Vanderweil Engineers
The Larkspur Energy Facility is a peaking plant consisting of two General Electric LM6000 aero-derivative combustion turbines equipped with SCR systems for emissions control.
Gemma’s EPC scope of work included project development support, along with complete plant design and construction from site preparation through substation construction and electrical interconnection. Construction began in April 2001 and substantial completion was achieved on July 13, 2001.