About Panda Liberty Power Project

Customer: Panda Liberty LLC
Location: Bradford County, PA
EPC Contractor: Gemma - Lane Liberty Partners
(a joint venture with The Lane Construction Corp.)
Design Engineer: POWER Engineers

The Panda Liberty Power Project is an 800 MW natural gas-fired combined cycle generating facility consisting of two 400 MW single-shaft power trains. The plant uses Siemens SGT6-8000H gas turbines, Siemens SST-5000 steam turbines, Siemens SGEN6-2000H hydrogen-cooled generators, Vogt “Smart-Box” Heat Recovery Steam Generators and Air Cooled Condensers. Gemma also constructed ancillary systems and buildings as well as the electrical interconnection facilities and tie-ins for natural gas, water and wastewater.

Limited notice-to-proceed was received on April 1, 2013. Full notice-to-proceed was received on August 21, 2013. Substantial Completion was achieved in April 2016.