Customer: Caithness Energy
Location: Harrison County, WV
Design Engineer: POWER Engineers, Inc.

Using state-of-the-art combined-cycle technology and a dry (air) cooling system, the 625 MW Harrison Energy Center will be a cost and fuel-efficient plant. The power train, in its own turbine building, will consist of one General Electric 7HA.02 gas turbine equipped with evaporative inlet cooling, one triple pressure reheat steam turbine and one water/hydrogen cooled electric generator arranged on a common single shaft. The power train will have an outdoor heat recovery steam generator equipped with supplemental duct firing capabilities, selective catalytic reduction technology for NOx, and an oxidation catalyst for CO/VOC reduction.