Customer: EverPower Wind Holdings, Inc.
Location: Cambria County, PA
EPC Contractor: Gemma Renewable Power, LLC
Design Engineer: Barr Engineering / Mott MacDonald, LLC

The 30 MW Patton Wind Farm consists of 15 Gamesa G97 wind turbine generators, each rated at 2.0 MW, and installed on 78m and 90m towers. Gemma Renewable Power’s project scope consisted of engineering, procurement and installation of roads, foundations, collection system, point of interconnection and collector substations and the 15 wind turbine generators.

Access road construction commenced in April 2012 and turbine installation began in September 2012. Commercial operation of the facility was achieved in December 2012.