| The Rowan County power project is a 525 MW two on one combined cycle power island. The combustion turbines are General Electric 7-FA units. The HRSGs were supplied by Nooter Ericksen and the 190 MW steam turbine was supplied by Toshiba.
Gemma’s EPC scope of work included complete plant design and construction from site development through electrical interconnection and initial plant operations.
Construction began in November 2001 and substantial completion is scheduled for May 2003. |