| The Richmond County Phase II power project is a 525 MW two on one combined cycle power island and a 178 MW simple cycle power island. All three combustion turbines are General Electric 7-FA units. The HRSGs were supplied by Nooter Ericksen and the 190 MW steam turbine was supplied by Toshiba.
Gemma’s EPC scope of work included complete plant design and construction from site development through electrical interconnection.
Construction began in October 2000 and substantial completion was achieved in June 2002. |